Murfreesboro’s Planning Commission approved plans for a nearly 100,000-square-foot Kroger and fuel station at Memorial Boulevard and Tillanook Lane. The plan puts the store farther from neighboring homes after the City Council raised drainage and setback concerns, and the commission required a change to help manage runoff.

The store is planned for roughly 13.4 acres at the intersection’s southwest corner. Murfreesboro’s Planning Commission approved the site plan Sept. 16 by a 7–0 vote, subject to staff comments and the addition of permeable pavers to help manage runoff.
Plans call for a 99,982-square-foot grocery store, dedicated Kroger pickup facilities and a fuel center with a small kiosk. Access would come from both Memorial Boulevard and Tillanook Lane, with proposed right-turn-lane improvements along both roads.
The September vote followed the City Council’s June 18 approval of the property’s rezoning to Planned Commercial Development. City records identify the project as Kroger U-839.
Getting to those approvals took changes to the layout.
On May 7, the council deferred the rezoning’s first reading over concerns about drainage and the building’s proximity to existing homes to the west. The applicant then removed excess parking and shifted the building east, according to a city staff memo prepared for the June 18 council meeting.
That revision placed the proposed building approximately 170 feet from the rear lot line of the adjacent residential property to the west. The revised proposal passed first reading June 4 before receiving final rezoning approval two weeks later.
Drainage remained part of the discussion when the site plan reached the Planning Commission in September.
City engineering staff called for parking stalls to be returned to permeable pavers to match the approved development plan. The city’s expectation was that the project would use both pavers, which allow water to soak into the ground, and detention facilities, which hold stormwater for later release. Staff also required a public drainage easement along the rear property line to accommodate drainage from land to the south.
At the Sept. 16 meeting, the project’s design engineer confirmed the commitment to include the pavers. The commission made their addition part of its approval motion.
The project also involves separate permitting and building review. The September staff comments identify a land-disturbance permit required before site work and city and state permits for work in public rights-of-way. Building plans and signs are reviewed separately.
What to watch next. The September vote approved the layout. A land-disturbance permit is required before site work. The city’s permit portal is the place to check for permit records. The Midstate could not verify an issued permit or opening date from the records available for this update.
Proposed Kroger site on the map
The proposed store is on the southwest corner of the intersection. Open in Google Maps.
Sources: This story is based on City of Murfreesboro records: the September 16 Planning Commission minutes, included in the September 30 meeting packet; rezoning Ordinance 26-OZ-12; the June 18 City Council staff memo; and the September 16 Planning Commission staff comments and plans.
